Darley Main Colliery Co v Mitchell: HL 1886

The owner of land whose land was affected by subsidence in 1868 and who received compensation from those who had worked coal and caused the subsidence, was able, in 1882 when further subsidence took place causing further injury, to bring a fresh action for compensation. No action could be brought in respect of a withdrawal of support until physical damage had occurred. That was then a fresh action. ‘A man slandered or libelled by words actionable in themselves must sue, if at all, for all his damage in one action.’ ‘No one will think of disputing the proposition that for one cause of action you must recover all damages incident to it by law once and for ever. A house that has received a shock may not at once show all the damage done to it, but it is damaged nonetheless [then] to the extent that it is damaged, and the fact that the damage only manifests itself later on by stages does not alter the fact that the damage is there; and so of the more complex mechanism of the human frame, the damage is done in a railway accident, the whole machinery is injured, though it may escape the eye or even the consciousness of the sufferer at the time, the later stages of suffering are but the manifestations of the [original] damage done, and consequent upon the injury originally sustained.’

Judges:

Lord Bramwell

Citations:

(1886) 11 App Cas 127

Jurisdiction:

England and Wales

Cited by:

CitedPhonographic Performance Limited v Department of Trade and Industry HM Attorney General ChD 23-Jul-2004
The claimant represented the interests of copyright holders, and complained that the defendant had failed to implement the Directive properly, leaving them unable properly to collect royalties in the music rental market. The respondent argued that . .
DistinguishedIqbal v Legal Services Commission CA 10-May-2005
The claimant had been a partner in a firm of solicitors. They came to be suspected by the respondent of overclaiming legal aid payments and sums were withheld. For this and other reasons the practice folded, and the claimant became insolvent. He . .
CitedPirelli General Cable Works v Oscar Faber and Partners HL 2-Jan-1983
The plaintiff asked the defendant consulting engineer to design an extension to their factory in 1969. Not later than in April 1970, cracks developed in the chimney. In 1977 the cause of the damage was discovered. It arose from design faults in the . .
CitedPatterson v Ministry of Defence QBD 29-Jul-1986
The plaintiff had been exposed to asbestos when working for the defendant. X-rays revealed development of pleural plaques, but these would remain asymptomatic.
Held: Material damage sufficient to set time running was the same as damage . .
MentionedRothwell v Chemical and Insulating Co Ltd and Another CA 26-Jan-2006
Each claimant sought damages after being exposed to asbestos dust. The defendants resisted saying that the injury alleged, the development of pleural plaques, was yet insufficient as damage to found a claim.
Held: (Smith LJ dissenting) The . .
CitedMoorjani and Others v Durban Estates Ltd and Another TCC 15-May-2019
Allegations of breach of landlords’ repairing obligations – defendants’ strike out application.
Held: ‘ the critical question is whether this second action is based on the same cause, or causes, of action, and not whether it pleads the same . .