The claimants had been engaged to provide an asbestos survey. An arbitration claim had gone against them and they appealed.
Akenhead J
[2013] EWHC 1322 (TCC), [2013] WLR(D) 211
Bailii, WLRD
Housing Grants, Construction and Regeneration Act 1996 108(5), Scheme for Construction Contracts (England and Wales) Regulations 1998
Cited by:
Appeal from – Aspect Contracts (Asbestos) Ltd v Higgins Construction Plc CA 29-Nov-2013
The appeal succeeded. The Scheme implied that any overpayment could be recovered. . .
At First Instance – Aspect Contracts (Asbetos) Ltd v Higgins Construction Plc SC 17-Jun-2015
Aspect had claimed the return of funds paid by it to the appellant Higgins under an adjudication award in a construction contract disute. The claimant had been asked to prpare asbestos surveys and reports on maisonettes which Higgins was to acquire . .