Barratt Homes Ltd v Dwr Cymru Cyfyngedig (Welsh Water): SC 9 Dec 2009

The developers wanted to construct their private sewer to the public sewer at a point convenient to them. The water company said a connection at the point proposed would overload the sewer, and refused. The developer claimed that it had the right to make the connection at that point. Held: The authority’s appeal failed. The … Continue reading Barratt Homes Ltd v Dwr Cymru Cyfyngedig (Welsh Water): SC 9 Dec 2009