Scottish Equitable Plc v Miller Construction Ltd: IHCS 31 Aug 2001

The parties entered into a contract for the demolition and building of offices. They sought to refer differences to arbitration. The issue as to whether the long or short prescription period operated so as to time bar some parts of the claim. Held: Time began to run only from the time of the issue of … Continue reading Scottish Equitable Plc v Miller Construction Ltd: IHCS 31 Aug 2001