Where a claim was framed as a fraction of the contract consideration, the plaintiff has fixed his damages. Where he claims to have contracted for a deluxe service rather than a normal level, it was for him to show the difference.
Ind Summary 26-Jun-1995, Times 21-Jul-1995
England and Wales
Updated: 09 June 2021; Ref: scu.90462