VAT – ZERO-RATING – whether work of removal of lead guttering of oriel bay window of protected building and associated drainpipe and addition of layer of slates work of alteration or repair and maintenance – held work that of alteration – appeal allowed
Citations:
[2005] UKVAT V19176
Links:
Jurisdiction:
England and Wales
VAT
Updated: 02 June 2022; Ref: scu.229935