Vossloh Laeis GmbH v Stadtwerke Munchen GmbH: ECJ 16 May 2018

Opinion – Reference for a preliminary ruling – Public procurement – Procedure – Directives 2014/24 / EU and 2014/25 / EU – Grounds for exclusion – Obligation on the economic operator to cooperate with the contracting authority to demonstrate its reliability before the end of the period of exclusion – Concept of ‘investigating authorities’ – Calculation of the maximum period of the exclusion period

Citations:

ECLI:EU:C:2018:316, [2018] EUECJ C-124/17 – O

Links:

Bailii

Jurisdiction:

European

Commercial

Updated: 21 April 2022; Ref: scu.615565