Commission v Poland (Industrial Policy): ECJ 13 Nov 2008

ECJ Failure of a Member State to fulfil obligations Electronic communications Networks and services Directive 2002/19/EC (Access Directive) Article 4(1) and the first subparagraph of Article 5(1) Incorrect transposition.

Judges:

CWA Timmermans, P

Citations:

[2008] ECR I-8403, C-227/07, [2008] EUECJ C-227/07

Links:

Bailii

Statutes:

Directive 2002/19/EC

Cited by:

CitedBritish Telecommunications Plc v Telefonica O2 UK Ltd SC 9-Jul-2014
The parties disputed the termination charges which BT was entitled to charge to mobile network operators for putting calls from the latter’s networks through to BT fixed lines with associated 08 numbers. BT had introduced new tariff charges.