claim for wasted costs and damages arising out of the termination of a contract for a new information technology system.
[2021] EWHC 347 (TCC)
Bailii
England and Wales
Updated: 31 October 2021; Ref: scu.663135 br>
claim for wasted costs and damages arising out of the termination of a contract for a new information technology system.
[2021] EWHC 347 (TCC)
Bailii
England and Wales
Updated: 31 October 2021; Ref: scu.663135 br>