(Judgment) Reference for a preliminary ruling – Internal market in electricity – Directive 2009/72 / EC – Transmission of electricity – Concept of’ transmission system operator ‘- Regulation (EC) No 714/2009 – Interconnection – Transmission line connecting national transmission networks of the Member States – Article 16 (6) – Scope – Use of the revenue resulting from the allocation of interconnection capacity – Undertaking operating only a cross-border high voltage line ensuring the interconnection of two transmission networks national transport
C-454/18, [2020] EUECJ C-454/18, ECLI: EU: C: 2020: 189, [2019] EUECJ C-454/18_O
Bailii, Bailii
European
Utilities
Updated: 17 January 2022; Ref: scu.654847